Linden Prep publishes two Arizona license guides (Electrician License and Low Voltage License) for electrician work in Arizona. This page sums up each one and links to the full version.
There are three electrical contractor classifications in Arizona: R-11 (residential), C-11 (commercial) and CR-11 (dual).
- R-11Residential Electrical, including Solar
- C-11Commercial Electrical
- CR-11Dual Electrical
- Exam time
- 4 hrsFor the state trade exam; the NASCLA option runs 4.5 hrs
- Time to get license
- ~4 yrsManagerial or hands-on, 4 years total
- Continuing ed
- Not requiredYou don’t need CE to renew
Read the full Arizona Electrician License guide
Last updated October 27, 2026 from Arizona Registrar of Contractors requirements
The Arizona Registrar of Contractors (ROC) licenses it as C-67 (commercial), R-67 (residential) or CR-67 (both).
- C-67Commercial low voltage
- R-67Residential low voltage
- CR-67Dual low voltage
- Exam time
- 2 hrsA 60-question trade exam, then the SRE online
- Time to get license
- ~2 yrsManagerial or hands-on experience, followed by the exams and your application
- Continuing ed
- Not stated
Read the full Arizona Low Voltage License guide
Last updated October 27, 2026 from Arizona Registrar of Contractors requirements